Arklow Bank Wind Park Phase 2

Jennings O’Donovan provided comprehensive PSDP services for the 800 MW Arklow Bank Wind Park Phase 2, managing safety and design coordination for both offshore turbine infrastructure and onshore grid connections.

Glenveagh National Park Infrastructure Upgrades

Strategic infrastructure and environmental upgrades at Glenveagh National Park, including the construction of a new footbridge, segregated cycle paths, and a comprehensive upgrade of the park’s wastewater treatment facilities.

Summerhill College Redevelopment, Sligo

A major 7,000m² redevelopment of Ireland’s largest northwest boys’ school, featuring a three-storey composite steel frame and specialized cell-beam gymnasium construction delivered through rigorous value engineering.

The Glasshouse Hotel, Sligo

A 29,000m² landmark hotel and apartment development in Sligo City Centre, featuring a complex structural steel frame, three-storey basement constructed below tidal levels, and a striking non-vertical glazed facade.

Tente Factory Expansion, Sligo

Full civil and structural engineering services for a 2,713m² industrial expansion of the Tente Ltd manufacturing facility in Sligo, featuring steel portal frames, gantry systems, and extensive site infrastructure.

Athlone Main Drainage Scheme

A flagship wastewater project for Athlone featuring 3km of tunnelled sewers, River Shannon crossings, and a 36,000 PE treatment capacity to protect local water quality.

Amasya Wastewater Treatment Project, Turkey

A flagship €11.5m EU-funded project transforming Amasya into a “Green City” through a 105,000 PE treatment plant, renewable energy recovery from sludge, and resilient flood protection measures.