Jennings O'Donovan & Partners were engaged as consulting engineers by CP Energy Ltd. for a Six Turbine Wind Farm with hub heights of 85 metres and rotor diameters of 71 metres, an electrical compound, site cabling, substation building, associated site roads and site works.
Jennings O'Donovan & Partners were engaged as consulting engineers by Tullynamoyle Windfarm Ltd. for the Six Turbine Wind Energy Development at Boleybrack Mountain, Co. Leitrim.
Development of a 21 wind turbine generator farm, each with a capacity of up to 3MW, to achieve a Maximum Export Capacity of 58MW. Project to be advanced sufficiently to meet a connection offer by Eirgrid in 2013.
Development of a 40 wind turbine generator farm, each with a capacity of up to 3MW, to achieve a Maximum Export Capacity of 90MW. Project to be advanced sufficiently to meet a connection offer by Eirgrid in 2013.